Two rules for the maintenance of sand making machines

Construction waste after the broken concrete particles, bricks, stone fragments and sand particles, different particle size is not the same application. We can according to the customer's request, the construction waste broken sieve to different specifications. Concrete particles can be used for unlimited roadbed, agricultural and woodland roads, pedestrian and bike lanes and concrete; brick, stone fragments or sand particles can be used for sports venues, gardens and scenic spots of stone, road grassroots and so on.


The use of construction waste disposal equipment to deal with construction waste, on the one hand to solve a large number of concrete waste disposal and the resulting negative impact on the environment, while saving a lot of clean-up costs; the other hand, can also reduce the exploitation of natural gravel. Our construction of the building garbage collection system set screening, broken, iron, dust as a whole, with sound, reduction and resource management and other characteristics, to meet the 40 to 300 tons per hour of construction waste disposal capacity The
Construction waste system is divided into fixed and mobile, fixed crushing station requires a specific site, the need for transport waste to the crushing station after the crushing operations. The mobile crusher station integrates all crushing and screening equipment into one or two wheeled live crawler platforms, which can be flexibly drawn to the required site for crushing operations.


The introduction of the mobile crusher eliminates the cumbersome steel frame structure and foundation construction, saving a lot of time.Mobile crushing station have reliable operation, easy operation, energy efficient features. Especially the mobility is very good, with the raw material or construction site together, and can be a variety of combinations to meet the needs of different materials.

没有评论:

发表评论