2017年3月30日星期四

What is the correct installation of the roller crusher?

The roller crusher is a kind of ore crushing machinery, which is often used for the crushing ores in the gravel production line. The crushing ratio of the roller crusher is large and can be used for the crushing of many different ores. The roller Crusher is widely loved by the users. Shanghai Joyal mining machinery remind the majority of users If you want to play good on the roller crusher , first should have the correct installation of the roller crusher.Here joayl talks about the installation of roller crusher.


In the installation of the roller crusher when the user first need to draw the base line, the basis of the standard board to make a correct cross line, elevation line, the central target buried to achieve ease of use, and then began to install the base of the roller crusher, Find the base and tug of the installation location, leveling is positive, the first hole grouting, concrete to a certain strength, tighten the anchor bolts, review qualified, and then install the roller broken body.


The first roller will be mounted on the roller crusher body, the need to fix the concave connector to a positive and an anti-staggered configuration, and adjust the thickness of the horn, so that the contact between the roller and concave joints to maintain the corresponding gap, do not agree , And spot welding the joint head of the joint with the roller crusher body. Those are the installation method for the roller crusher, and there are some installation precautions as follows.



Install the pair of gears on the roller before the gear check the interface can not have a collision mark, the large gear and the roller crusher body contact surface clean, and then the two gears carefully and tighten the interface bolts, then large The gears are mounted on the roller crusher body, in this process to ensure that the roller crusher gear clean, can not damage the parts of the roller crusher.

After the large gear of the roller crusher is installed, the operator needs to adjust the large and small gear meshing parameters according to the installed large gears and meet the requirements of the equipment requirements, fixed pinion and reducer motor.